Building

New home builders in Kerikeri and the Bay of Islands

A new home involves more than the construction itself. The site, design, materials, services and finishing decisions all need to work together. Clarke's Construction provides building, electrical and painting through one company, giving you a practical starting point for discussing how your home will be built.

A new single-storey weatherboard home with a covered outdoor area, set on a lawn with native plants.
On this page

We work in Kerikeri and the Bay of Islands. Whether your plans are well developed or you are still establishing the brief, tell us what stage you have reached and what matters most to you.

Set the project up around the actual site

Access, levels, ground information and the connection of services can influence both the construction and the budget. A plan that works on one section may need a different approach somewhere else.

Bring the plans and site information you already hold. We can discuss what is available, what needs more detail and which design or specialist input must be arranged before the building work can be properly scoped.

Connect construction with the finishing decisions

The building, electrical and painting stages are connected. Lighting and power positions need to suit the layout. Changes made after walls are lined can be more involved than decisions made earlier. Materials and finishes also affect the sequence of work.

With those three services within the same business, the conversation can cover how the parts fit together. Our proposal identifies what Clarke's is doing and how any separate designers, engineers and specialist contractors are involved.

What we need to discuss

  • The property location and access.
  • Your plans, specifications and site information.
  • The size, layout and priorities for the home.
  • Materials, fittings and the level of finish.
  • Electrical requirements and decisions needed before lining.
  • Responsibility for design, consents and specialist input.
  • Budget, intended timing and the scope of the building agreement.

From an idea to an agreed building scope

Start by sharing your plans or a short description of the home you are considering. The next step may be a discussion, a site assessment or further design information. Once the project is defined well enough, the proposal can explain the agreed work, allowances, exclusions and practical next steps.

Timing depends on the site, design, approvals, supply and the actual work. We discuss the programme for the particular project rather than promising the same completion period for every home.

Questions about building a new home

Can I bring plans from my own designer?

Send through what you have and tell us who is involved. We can discuss the construction scope and what other information is needed to develop it.

Do you provide every part of a new build?

Building, electrical and painting are Clarke's services. The full contract scope and the responsibilities of other specialists must be confirmed for your project.

Can you give a price from the floor area alone?

Floor area is only one factor. The site, design, structure, specification, access and service requirements can all affect the proposal.

Would an extension be a better option?

That depends on your existing property, the space you need and the work involved. Our extension and renovation pages explain those alternatives so you can begin with the right questions.

Next step

Start with the home and the site

Tell us where you want to build, whether you already have plans and the stage you would like help with.