Our work
A bathroom from the stripped framing to the new shower base
These photographs follow a bathroom stripped back to its framing, with props holding the structure. They show decayed timber and flooring at the base of the walls, new framing going in, the concrete floor cut open for the waste pipes, the new shower wall framed with insulation and pipework, and the new shower base set in place.

The bathroom, stage by stage
Every photograph of the job in order, from the room stripped back to its framing to the new shower base.
Next step
Planning something similar
Tell us what you like about this example and what your property needs. The right scope depends on the site, condition and outcome you want.
See also







